What you need to perform it
Primary qualification
- Ship's cook certificate under MLC 2006 (Regulation 3.2 / Standard A3.2): a qualified, certificated cook is mandatory on ships with 10 or more crew.
- Professional culinary training: Cooking and Gastronomy technician diploma or equivalent, with years on the hot line in volume catering.
- Offshore access: OPITO BOSIET/FOET with CA-EBS and a valid offshore medical (OEUK or equivalent).
Basic STCW
- A-VI/1
- OPITO BOSIET current
Specific courses
- Advanced HACCP and volume-catering food safety (UK Level 3 as reference — indicative)
- Allergen management (Reg. (EU) 1169/2011) and special diets
- Stock and ordering management around offshore supply windows
- Safe use of cold rooms, industrial cutlery and high-volume galley equipment
Indicative experience
Indicative: 3-5 years in volume or marine catering, with 1-2 campaigns as offshore second cook before taking charge; catering contractors (ESS, Sodexo — sector examples) apply their own promotion matrices.
Observations
Usually employed by the catering contractor, not the driller. Typical rotations 4/4 or 6/6 weeks (indicative). Progression: galleyhand → cook → Chief Cook → Camp Boss / head of the unit's hotel services.
What this role does
Runs the galley of a 100-200 POB offshore unit: plans day- and night-shift menus, manages ordering and stock around supply-boat windows, applies HACCP in an environment with no easy evacuation and sustains morale — on long campaigns the galley is the rig's mood barometer.
Typical watches
- 12 hour shifts (4 daily services)
Key responsibilities
- Menu planning for 4 meals a day (breakfast, lunch, dinner, midnight meal).
- Preparation of all the culinary production of the platform.
- Supervision of kitchen equipment and compliance with HACCP standards.
- Inventory control, food conservation and temperatures.
- Coordination with Camp Boss for supply orders.
Operational scope
- Industrial kitchen
- Food warehouse
- HACCP supervision
Profile reviewed by HydroAbyss (2026). Cited rules and timeframes are indicative: the final requirement is set by the flag State, the Administration and each company.