What you need to perform it
Primary qualification
- Internal promotion from Roughneck/Floorman or Derrickman per the drilling contractor's competence matrix (industry practice).
- Valid IADC WellSharp or IWCF well-control certification at Driller/supervisory level (two-yearly renewal — as a guide).
- No STCW officer licence required: this is industrial personnel of the unit under the IMO MODU Code; maritime safety training depends on flag and operator.
Basic STCW
- STCW A-VI/1 Basic Training per flag/role in the unit's muster arrangements.
- Valid OPITO BOSIET/FOET with CA-EBS for helicopter transits.
- Offshore medical certificate (OEUK/OGUK scheme or equivalent — as a guide).
Specific courses
- IWCF/IADC WellSharp well control, Driller level — indispensable, renewed every 2 years (as a guide).
- H2S safety (ANSI/ASSP Z390.1 reference or OPITO scheme — as a guide).
- Working at height and rescue, lifting and banksman/slinger duties.
- Permit to work and energy isolation (LOTO) under the contractor's management system.
- Installed maker's equipment: top drive, iron roughneck and mechanised pipe handling (NOV, Cameron or others per unit).
Indicative experience
As a guide: 4-8 years on the drilling crew (roustabout → roughneck → derrickman) before the post; promotion requires passing supervisory-level well control and the Toolpusher's appraisal. Each contractor sets its own matrix.
Observations
Drilling ladder: Roustabout → Roughneck → Derrickman → Assistant Driller → Driller → Toolpusher. This is the second man at the console: in a well kick, the first BOP shut-in actions may fall on him, which is why supervisory well control is non-negotiable. Requirements come from the contractor (Transocean, Valaris, Noble…), not from an international certification convention: the OPITO/IADC matrix is the sector's de facto standard.
What this role does
The Assistant Driller is the Driller's direct reliever and main support during operations. It is the natural progression route to the Driller position.
Typical watches
- 12-hour shifts on rotation (typically 14/14 or 28/28 depending on the contractor)
Key responsibilities
- Assist the Driller at the drilling console and relieve him in his absence.
- Supervise the drill-floor crew during tripping and pipe-handling operations.
- Monitor well parameters and take part in early kick detection and shut-in.
- Check the hydraulic systems, top drive and the floor's pipe-handling equipment.
Operational scope
- Drilling console
- drill floor
Profile reviewed by HydroAbyss (2026). Cited rules and timeframes are indicative: the final requirement is set by the flag State, the Administration and each company.