ES · EN · PT

IMO / STCW · Merchant Vessel · Electrical

Electro-Technical Officer (ETO)

Also known as: ETO · Electro-Technical Officer · OET · Electrical Officer

Technical lead for electrical and electronic systems.

What you need to perform it

Primary qualification

  • Electro-Technical Officer certificate of competency — STCW Regulation III/6 (Code A-III/6): minimum age 18 and 12 months of combined workshop training and approved seagoing service with a training record book (at least 6 at sea), or 36 months of training and seagoing service of which no fewer than 30 in electro-technical engine-department duties.
  • Spain: professional Electro-Technical Officer title under RD 973/2009, as amended by RD 80/2014, which added the title to the Spanish framework (academic route via the nautical faculties — exact itinerary as a guide).
  • Flag endorsement (STCW I/2) and, if serving on oil, chemical or gas tankers, the applicable STCW V/1 tanker training (verify per ship).

Basic STCW

  • STCW A-VI/1 Basic Safety Training.
  • A-VI/2-1 (survival craft and rescue boats), A-VI/3 (advanced fire fighting) and A-VI/4-1 (medical first aid) as the officer package.
  • Valid seafarer medical certificate.

Specific courses

  • High voltage (> 1,000 V): operational/management-level course per A-III/6 competences (IMO model course 3.35 — as a guide).
  • PLCs, automation and the installed maker's control/alarm systems (Kongsberg, SAM Electronics, Valmet or others per ship).
  • Electric propulsion and variable-frequency drives (diesel-electric and passenger ships — fleet dependent).
  • Safe isolation of energy (LOTO) and live-panel work per company procedures.
  • Maintenance of batteries, UPS and emergency sources (emergency generator, lighting).
  • GMDSS and bridge equipment: at-sea maintenance as a means of availability requires a radio-electronic certificate (STCW IV/2); without it the ETO is limited to first-line support (as a guide).

Indicative experience

For the CoC: the 12 months of approved programme with training record book (or the 36/30 route) of Regulation III/6. For a first posting as the ship's only ETO, companies typically ask for 1-2 prior contracts as junior or in an accompanied fleet, as a guide. Each company sets its own minimums.

Observations

Do not confuse Regulation III/6 (electro-technical officer) with III/7 (electro-technical rating, ETR). Typical route: Electro-Technical Cadet → ETO → senior ETO / Chief Electrician (passenger and offshore) → shoreside electrical superintendent; the path does not lead to Chief Engineer unless the III/1-III/2 licences are also obtained. Boundaries with radio/navigation support depend on the company and the maintenance matrix: at sea, touching GMDSS without a radio-electronic certificate compromises the availability required by SOLAS IV (as a guide). On passenger and DP ships the electrical plant is a critical capability: emergency-source testing discipline is weekly, not optional.

What this role does

DepartmentElectrical
GroupElectrical Officer / ETO
Role typeTechnical Officer
Reports toChief Engineer
SupervisesETO Cadet

Ensures electrical continuity and rapid response to critical automation and control failures. On diesel-electric, passenger or dynamically positioned ships the role's weight grows: propulsion, manoeuvring and hotel load depend on the electrical plant, and a blackout is a shipwide emergency, not a minor breakdown.

Typical watches

  • Planned-maintenance day work with on-call duty (UMS)

Key responsibilities

  • Manage the ship's electrical and electronic systems: generation, distribution and consumers.
  • Maintain switchboards, automation, alarms, PLCs and the machinery control systems (AMS).
  • Operate and maintain high-voltage installations (> 1,000 V) with isolation and lockout-tagout (LOTO) procedures.
  • Support navigation and communications equipment per the company's maintenance matrix.
  • Record maintenance in the PMS and manage electrical spares and consumables.

Operational scope

  • Electrical energy
  • Automation
  • Electronics

Profile reviewed by HydroAbyss (2026). Cited rules and timeframes are indicative: the final requirement is set by the flag State, the Administration and each company.